Content area

Abstract

(CCNMatthews - June 6, 2007) - Astral Mining Corporation ("Astral" or the "Company") (TSX VENTURE:AST)(PINK SHEETS:ASMGF)(FRANKFURT:A7D)(WKN:A0JDX3) is pleased to provide an update on the ongoing Phase I diamond drilling program on its Jumping Josephine (JJ) Gold Project in southeast British Columbia. Astral is earning a 60% interest in the JJ Project from Kootenay Gold Inc. (TSX VENTURE:KTN). At the JJ Main discovery zone 1,461m in 20 holes have been completed along 5 fences, testing the gold-bearing quartz stockwork zone over a strike length of 180m and to a vertical depth in excess of 100m. Surface trenching on the stockwork zone during 2006 by Astral Mining returned channel sample intersections of up to 31.19 g/t gold over 7m, including 133.91 g/t gold over 1m (see Astral's December 14th 2006 news release). Core logging, cutting and sampling is proceeding and samples from half of the holes have now been submitted for analysis. Results will be released in batches as they are received.

Details

Title
Update on Astral's Jumping Josephine Gold Project Drilling Program
First page
1
Publication year
2007
Publication date
Jun 6, 2007
Publisher
Intrado Digital Media Canada Inc.
Source type
Trade Journal
Language of publication
English
ProQuest document ID
447682508
Copyright
Copyright CCNMatthews Jun 6, 2007