Full Text

Turn on search term navigation

© 2020. This work is licensed under http://creativecommons.org/licenses/by/3.0/ (the “License”). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.

Abstract

The successful quality management of the external stone cladding system in production and installation stages is of vital importance to ensure the high quality of the completed system. Nevertheless, little research has been conducted in this area. This research aimed to report the current status of the external stone cladding system in the production and installation stages in Hong Kong. To do so, this paper examines its current practices and major issues occurred through case studies, questionnaire surveys, and interviews. The results revealed the insufficiency in control mechanism and quality control in the system in Hong Kong. Furthermore, the factors to ensure the quality of the two stages were determined. Lastly, this research suggested recommendations on the possible measures to improve the system quality: pre-testing of stone materials and anchorage system, quality assurance of suppliers and manufacturers, regular inspections and audits on production, and continuous site quality supervision and checklist. The findings and outcomes of the research could lead to actions to guarantee steady quality for the stone cladding façade.

Details

Title
A Study on the External Stone Cladding System in Production and Installation Stages: The Case of Hong Kong
First page
8207
Publication year
2020
Publication date
2020
Publisher
MDPI AG
e-ISSN
20763417
Source type
Scholarly Journal
Language of publication
English
ProQuest document ID
2463793822
Copyright
© 2020. This work is licensed under http://creativecommons.org/licenses/by/3.0/ (the “License”). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.