It appears you don't have support to open PDFs in this web browser. To view this file, Open with your PDF reader
Abstract
This research aims to identifying, measuring and establishing risk in food and beverage industry. The risk management is implemented by referring to Australia/New Zealand 4360 Standard which has four phases such as problem formulation, risk analysis, risk characterization, and risk management. The implementation of risk management is done by case study at Back Alley Café. Based on the risk identification result, there are 59 risks were found in Back Alley Café. The risk identification is conducted based on observation and interview with the café manager who understand the condition of Back Alley Café properly. Based on the assessment of impact and probability, the risk mapping produced four risks at extreme level, 16 risks at high level, 24 risks at medium level, and 18 risks at low level. The strategy was designed as the risk mitigation after the risk mapping for the extreme and high level. The strategy which is given as the prevention or treatment of risk in Back Alley Café is divided into three. There are reducing the risk, sharing the risk and accepting the risk. The strategy is then implemented for each relevant activities.
You have requested "on-the-fly" machine translation of selected content from our databases. This functionality is provided solely for your convenience and is in no way intended to replace human translation. Show full disclaimer
Neither ProQuest nor its licensors make any representations or warranties with respect to the translations. The translations are automatically generated "AS IS" and "AS AVAILABLE" and are not retained in our systems. PROQUEST AND ITS LICENSORS SPECIFICALLY DISCLAIM ANY AND ALL EXPRESS OR IMPLIED WARRANTIES, INCLUDING WITHOUT LIMITATION, ANY WARRANTIES FOR AVAILABILITY, ACCURACY, TIMELINESS, COMPLETENESS, NON-INFRINGMENT, MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. Your use of the translations is subject to all use restrictions contained in your Electronic Products License Agreement and by using the translation functionality you agree to forgo any and all claims against ProQuest or its licensors for your use of the translation functionality and any output derived there from. Hide full disclaimer
Details
1 Industrial Engineering, Institut Teknologi Harapan Bangsa Jl. Dipatiukur No. 80-84 Bandung, Indonesia