© 2024 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.

Abstract

The pre-tender cost estimation serves as the foundation for determining the project cost in the early stages and is crucial for all parties involved in the tendering process. It is expected to be highly accurate. However, industry surveys have advocated that in the Iranian construction industry, the pre-tender estimated costs of construction projects are not sufficiently accurate during the bidding stage. Building information modelling (BIM) technology is a modern digital tool deployed in the construction industry that has seen substantial growth of application. It employs useful tools in different sectors and has extended its involvement in various stages of the project lifecycle, including feasibility studies, planning, design, construction, and operation and maintenance. This study examines and assesses the status of BIM development in Iran for its applicability in the pre-tender cost estimating process in construction projects. The findings of this study indicate that while there is a limited number of Iranian building projects’ BIM models that possess the required quality and capabilities for BIM-based cost estimation, the results obtained are more precise when compared to existing manual methods. Additionally, utilising BIM-based cost estimation significantly reduces the time required for this process by enhancing the speed of cost estimation operations. An innovative evaluation framework for assessing the quality and functionalities of BIM models is presented, which improves the accuracy of cost estimation before the bidding process in Iran’s construction industry. The research findings demonstrate the enhanced accuracy and effectiveness of BIM as compared to conventional approaches. It also suggests the incorporation of AI technology for model evaluation, which has the potential to become an established global industry standard.

Details

Title
Applying Building Information Modelling (BIM) Technology in Pre-Tender Cost Estimation of Construction Projects: A Case Study in Iran
Author
Rashidi, Amirreza 1   VIAFID ORCID Logo  ; Chan, Daniel W M 2   VIAFID ORCID Logo  ; Ravanshadnia, Mehdi 3 ; Sarvari, Hadi 4 ; Tajaddini, Abbas 1 

 Department of Civil Engineering, Karaj Branch, Islamic Azad University, Karaj 3149968111, Iran; [email protected] (A.R.); [email protected] (A.T.) 
 Department of Building and Real Estate, The Hong Kong Polytechnic University, Hung Hom, Kowloon, Hong Kong, China; [email protected] 
 Department of Civil Engineering, Science and Research Branch, Islamic Azad University, Tehran 1777613651, Iran; [email protected] 
 Department of the Built Environment, City Centre Campus, Birmingham City University, Millennium Point, Birmingham B4 7XG, UK 
First page
1260
Publication year
2024
Publication date
2024
Publisher
MDPI AG
e-ISSN
20755309
Source type
Scholarly Journal
Language of publication
English
ProQuest document ID
3059506071
Copyright
© 2024 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.