1. Introduction
The different services carried out by the transmission system operators (TSO) for a reliable and secure power system are known as ancillary services [1]. Among them, load-frequency control focuses on mitigating the effects of unpredictable changes both in the demand and in the generation units that can address frequency deviations [2]. In fact, power imbalances between generation and consumption cause frequency variations [3]. In Europe, frequency control has a hierarchical structure, usually organized in up to five layers (from fast to slow timescales): (i) frequency containment (also known as primary frequency control); (ii) imbalance netting; (iii) automatic and/or manual frequency restoration (also known as secondary frequency control), and (iv) replacement [4]. If the different reserves of such frequency control layers are consumed or unable to keep frequency within an acceptable range, a variety of strategies called special protection systems are then used. Load shedding is included in those special protection systems. Moreover, it is considered as the last option to prevent frequency instability [5]. Despite load shedding being an effective solution to prevent a power system collapse after a major imbalance, it is considered as an undesirable situation and it is important to reduce it as much as possible [6,7,8].
Traditionally, power systems have been based on conventional power plants with synchronous generators directly connected to the grid, automatically providing their stored kinetic energy after a generation-load mismatch [9]. However, in recent decades, power systems have been suffering a slow change from conventional synchronous power plants to inverter-interfaced renewable energy sources (II-RES), i.e., wind power plants based on variable speed wind turbines (VSWTs) and/or solar photovoltaic (PV) [10]. Among them, VSWTs are considered as the most efficient, developed, and installed renewable resource, and currently they account for more than 650 GW of installed capacity around the world [11,12]. This remarkable integration of wind power plants requires an important reformulation of their contribution to ancillary services [13]. Moreover, as they are connected to the grid through power inverters, the synchronous inertia of the power system decreases when such renewable source replaces conventional power plants [14]. Indeed, faster rate of change of frequency (RoCoF) and larger frequency deviations are related to low synchronous system inertia values [15]. These effects are even more critical in isolated power systems [16,17]. As a result, Toulabi et al. consider that, due to the massive integration of VSWTs, their participation into frequency control is necessary [18]. With this aim, different frequency control approaches can be found in the specific literature to effectively replace conventional power plants by VSWTs and maintain a reliable power system operation [19]. These strategies are summarized in Figure 1 according to the different approaches [20,21].
VSWTs are designed to work in their maximum power point (MPP) according to the available wind speedsw:pMPP(sw) [22]. As a consequence, the first approach (deloading technique) consists of operating the VSWTs in a suboptimal power pointpdel, belowpMPP(sw). Therefore, a certain amount of powerΔpd can be supplied in case of a power imbalance [23,24]. Two different possibilities are identified [25]: (i) the pitch-angle control and (ii) over-speed control. In the first one, the pitch angle is increased fromβ0toβ1for a constantsw. Subsequently, the generated powerpdelis below the maximum powerpMPP [26,27,28,29]. When the additional powerΔpdis supplied, the pitch angle reduces toβ0. The over-speed control increases the rotational speed of the rotor, shifting the supplied powerpdeltowards the right of the maximum powerpMPP [30,31,32]. When the additional powerΔpdis supplied, the rotor speed has to be reduced toωMPP , releasing kinetic energy [33]. However, despite the fact that this technique can improve the long term frequency regulation, it is not an economically viable solution for wind power plants’ operators due to loss of profits [34].
Due to the power inverter, VSWTs cannot naturally provide the kinetic energy stored in their rotor and generator. To overcome this, one or more additional control loops must be included in the power inverter. Three different possibilities can be found in the specific literature: (i) the droop control, (ii) the hidden inertia emulation control, and (iii) the fast power reserve approach. The droop control provides an additional active powerΔpproportional to the frequency deviationΔf, followingΔp=−ΔfRWT, whereRWT is the droop control setting of the VSWT [35,36,37,38,39]. This definition ofΔp gives an adaptive response depending on the frequency excursion severity and thus emulating primary frequency control of conventional generation units [40]. The hidden inertia emulation control usually includes two different loops: one considering the RoCoF and the other considering the frequency excursion (Δp∝RoCoF&Δf ) [41,42,43]. However, there are also proposals to use only one additional loop, beingΔp∝RoCoF [44,45,46]. Even though these methods improved the nadir frequency (minimum value), a little frequency dip was observed in later stages. This was due to a small reduction in the generated power compared to the prefault active power (thus, not operating in the MPP) [47]. The fast power reserve approach defines the overproduction powerΔp as a constant value independent of the power system configuration and frequency deviation [48,49,50,51] or as a variable value depending on the frequency deviation or minimum rotor speed limits [52,53,54]. With these three techniques, as the additional powerΔp is provided, the rotor and generator rotational speeds decrease (subsequently, modifying their torques). Rotor speed variations cause large amplitude edgewise vibrations for the blades [55], affecting the productivity and reducing the efficiency [56]. Large torque increases can address severe mechanical loads on the turbine, even causing critical situations under high mechanical stress conditions [57]. Moreover, consecutive torque increments is related to random load cycles, with important influences on fatigue loads [58].
In this work, a new fast power reserve controller for frequency regulation is proposed for isolated power systems including conventional generation (thermal units) and wind power plants (VSWTs). The proposed adaptive frequency controller is based on a linear regression from different power system parameters (i.e., RoCoF, active power supplied by each synchronous group, and synchronous inertia) to estimate the additional power provided by the wind power plants by maintaining certain frequency thresholds. This way mechanical stress is reduced without excessively prejudicing power system. Subsequently, VSWTs do not always participate in the frequency control but only when they are required according to both the monitored variables. VSWTs frequency control contributions are thus optimized, improving the grid frequency response and providing similar or lower load shedding actions in line with previous frequency control strategies. This proposed VSWT controller approach is tested in the Gran Canaria Island (Canarian archipelago, Spain), an isolated power system where the wind power capacity has doubled since 2017 (from 90 to 180 MW) [59]. Moreover, from 2005 to 2010, more than 200 trips of generators were registered per year in the Canarian archipelago, hence activating the corresponding load shedding programs [60].
The rest of the paper is organized as follows: Section 2 describes the mathematical model used to simulate the power system under consideration; the new frequency control approach proposed in this work is explained in Section 3; cases of study and simulation results are provided in Section 4; Finally, Section 5 gives the conclusions.
2. Power System Modeling
A mathematical model has been designed to analyze the proposed VSWT adaptive frequency control in an isolated power system. A generic wind-thermal isolated system is considered in this study (refer to Figure 2), including steam, diesel, gas, and combined cycle units, as well as wind power plants. Consequently, the model developed in Matlab/Simulink (2016) includes these thermal units, one equivalent VSWT acting as the wind power plants, the automatic generation control (AGC), the power system, and the power demand (including a load shedding scheme). The electromagnetic transients are supposed to be much faster than the other components of the model, and their influence in the system’s dynamics is omitted [61]. In Figure 3, the block diagram of the power system under study can be seen.
2.1. Power System
Frequency regulation based on droop speed control can be divided into two consecutive control actions: frequency containment and frequency restoration. On the one hand, frequency containment (or primary frequency regulation), which is based on the governor control, adjusts the active power of the generation units to correct frequency variations. In fact, the frequency nadir is directly related with the generator’s droop characteristic. In Spanish electric power system, primary regulation services act up to 30 s after a frequency disturbance [62]. On the other hand, frequency restoration (or secondary frequency regulation) refers to the AGC, adjusting the active power output of generation units to bring system frequency back to its rated value after the governor-based primary response.
An aggregated inertial model is commonly used to analyze frequency deviations in isolated power systems [63]. This modeling approach has been previously applied in El Hierro isolated power system (another isle of the Canarian archipelago) in [64]. Therefore, frequency deviations are the result of the imbalance between the power supplied by the generation units and the power demand:
fdfdt=1Tm,ther(t)(pther+pw−pdem−DnetΔf),
whereTm,ther(t)corresponds to the total mechanical inertia of thermal units depending on the number of generation operating units at each moment. Note that only thermal units provide inertia to the power system, since VSWTs are decoupled from the grid through power inverters.
When frequency disturbances are higher than certain limits, an under frequency load shedding scheme is activated to recover the grid frequency and fulfill certain frequency range requirements. In this work, a realistic load shedding scheme is included, consisting of the sequential and sudden disconnection of certain amount of load as established frequency thresholds are exceeded. The load shedding program can be found in [59].
2.2. Thermal Power Plants
The different thermal generation technologies (i.e., steam, diesel, gas, and combined cycle) included in the isolated power system are modeled by different transfer functions proposed in [59,65]. These transfer functions supply the power variation of each thermal technology from the frequency deviation and power reference provided by the AGC. Both the model and the parameters can be found in [59]. Since fast response of combined cycle power plants is in charge of the gas turbines, frequency response of combined cycle and gas units is assumed to be equal. The total thermal generation is then the sum of each thermal unit power supplied.
2.3. Variable Speed Wind Turbines
One equivalent VSWT model aggregating all the VSWTs is used [59,66]. The proposed VSWT equivalent model includes the wind power model and both pitch and torque maximum power point tracking control. Further information can be found in [67]. The one-mass rotor mechanical model is used for simulations, which is detailed enough according to [68] for power converters decoupling the generator from the grid. The VSWT diagram is represented in Figure 4. This wind turbine model has been previously used in [69] for short-time period frequency analysis. The equivalent aggregated wind turbine modeling also includes the frequency control response strategy, described in Section 3.
2.4. Automatic Generation Control (AGC)
The secondary control action removes the steady-state frequency error after the primary frequency control. It is modeled similar to [70]. The total secondary regulation effort (ΔRR) is obtained from:
ΔRR=−ΔfKf,
beingKf determined according to the European Network of Transmission System Operators for Electricity (ENTSO-E) recommendations [71]. This regulation effort is distributed among each i synchronized thermal unit as a function of their participation factors (Ku,i ), which are related to the speed droop of each unit [72]. Subsequently, the result of adding allKu,imust be one:
Δpiref=1Tu,i∫ΔRRKu,idt=−1Tu,i∫Ku,iKfdt,
where i representsgas,cc,die, andstrespectively. All thermal units connected to the grid participate in secondary control, whereas the participation factors of those units not connected are considered as zero,Ku,i=0.
3. Adaptive Frequency Control Strategy—Methodology
The adaptive control approach proposed in this work tries to minimize the effort of VSWTs when providing frequency response. The proposed approach is based on the fast power reserve technique. This control strategy distinguishes two different periods after a sudden power imbalance: (i) overproduction and (ii) recovery. During overproduction, the stored kinetic energy in the rotating masses of the VSWTs is supplied to the grid as an additional active powerΔpduring a few seconds, being thuspwoverpMPP(sw). Subsequently, the rotational speedωis reduced. Different definitions of thisΔphave been proposed. In fact, some authors considerΔp as a fixed constant value [48,49,50,51], whereas others propose to estimateΔp as dependent on the torque limit [52] or proportional to the frequency excursion [53]. The recovery period aims to restoreωto the prefault rotational speed valueω0. To overcome this,pwshould be reduced belowpmech(ω). Previous proposals specified an underproduction powerpUPby different ways, being thus the supplied power of each VSWTs:pW=pmech−pUP.
In the proposed adaptive frequency control strategy, the initial value ofΔp for the overproduction period is related to the power system conditions. The authors propose a new frequency control approach based on the methodology followed in [73]. This reference estimates the exact and minimum amount of load needed to be shed after an imbalance depending on the RoCoF. In fact, a decision table that links the RoCoF with the strict amount of load shedding is developed based on presimulations. Then, the corresponding load shedding is activated after a contingency, tripping some amount of load demand immediately [74]. In this case, the proposed adaptive controller is based on a decision table that estimates the accurate value ofΔpfor the VSWT overproduction.
The first step to formulate the decision table consists of defining several simulation scenarios that reflect the variability of the demand, the scheduling units, and/or the wind power penetration. To estimate the overproduction powerΔp after the outage of a thermal group, an iterative process is proposed for each scenario (see Figure 5). The condition considered to calculate suchΔpis that frequency f should not be below a certain limitflimfor longer than a preset time limittlim. Both valuesflimandtlimare related to the load shedding program of the power system. A counter is thus triggered when f is belowflim, computing the time that frequency is under thatflim. Initially, the i–scenario is simulated assuming that the overproduction power in the first iteration j is equal to 0 (Δpj=0). If f is belowflimfor longer thantlim,Δpjis increased by a fixed valueΔpincwith respect to the previous iteration (Δpj=Δpj−1+Δpinc) and the same i–scenario is simulated again with the new value ofΔpj. When the condition is satisfied (i.e., f is belowflimless time thattlim), the minimumΔpfor the i–scenario (Δpi) that VSWTs should provide has been determined (Δpi=Δpj). Note that the overproduction powerΔp is supplied with a delay of 200 ms, in order to have the measure of the RoCoF and in line with the delay time-interval in between 50 and 500 ms suggested in [75]. Once all theΔpvalues have been determined from the simulations, a mathematical relationship between suchΔpand other variables of the power system need to be found. The obtained expression will be the decision table for the adaptive controller.
When a power imbalance occurs, the VSWTs’ controller determines the overproduction powerΔpaccording to the previous decision table. This situation causes a suddenpwincrease and, after that, the supplied power starts to decrease. In this approach, instead of “forcing” the recovery period, the transition to recovery is carried out by the rotor speed PI controller in the converter, which slowly reduces the active power to achieve againpMPP(sw). In order to avoid a fast power change, that could cause a secondary frequency dip,KptandKit (proportional and integral constants of the converter, refer to Figure 4) must be conveniently tuned. As a consequence, instead of fixing apUP or defining an underproduction trajectory, the converter should adapt both the electrical power and the rotational speed to make them return to their pre-event values. Figure 6 presents the evolution ofPWandωunder an imbalanced situation with the proposed approach, pointing out the overproduction and recovery periods.
4. Case Study—Results
The VSWT adaptive control strategy proposed in this study is applied to the Gran Canaria power system. Gran Canaria Island belongs to Spanish Canarian archipelago, being thus an isolated power system. Its electrical generation has always been based on fossil fuels from two power plants: Jinámar and Barranco de Tirijana power plants. These power plants included diesel, steam, gas, and combined cycle units. However, in recent decades, the government started to promote wind power plants’ installation, doubling its capacity up to 180 MW since 2017. Table 1 lists each thermal unit capacity of the Gran Canaria power system.
4.1. Scenarios under Consideration
Thirty different generation mixes of supply-side programs are under study for different demands and wind power generation. The generation mix scenarios are taken from [59], where a unit commitment model was also included. Figure 7 presents the different supply-side energy schedule of each program. From these generation mix scenarios, two different imbalance conditions are defined: (i) the loss of the largest power plant and (ii) the loss of the second largest power plant. In this way, a total of sixty different scenarios are analyzed. Figure 8 summarizes the supply-side after the disconnection of the largest and second largest units. In addition, it also points out the percentage that represents the loss of each unit over the total system demand.
4.2. Decision Table Definition: Regression Analysis
From the sixty scenarios presented in Section 4.1, the correspondingΔp values are determined following Section 3. In this work, and according to the load shedding scheme presented in [59],flim=49Hz,tlim=1s andΔpinc=0.01pu for the Gran Canaria island power system. A mathematical relationship between suchΔp and other variables of the power system need to be found. As aforementioned, [73] proposed to relate the power to be shed with the RoCoF by a linear and quadratic regression, withR2=0.951andR2=0.969, respectively. However, both the linear regression and the quadratic regression ofΔPand RoCoF for this case study accounted for low values ofR2:R2=0.433for linear regression andR2=0.512for quadratic regression. As a consequence, other variables are introduced in the proposed mathematical lineal regression. By also considering the electrical power of each thermal technology assigned in the scheduled program, the system synchronous inertia before the incident, and neglecting all those cases in which the estimatedΔpwasΔp=0, the coefficient of determination increased toR2=0.801 following Equation (4):
ΔP=−386.15+108.63·RoCoF−1.32·Pgas+0.26·Pdie+0.65·Pst−0.42·Pcc+32.92·Tm,
beingΔPin MW, RoCoF in Hz/s,Piin MW (i stands forgas,cc,dieandst), andTmin s.
Comparing the results ofΔP obtained from the simulations and those estimated with Equation (4), two additional conditions were included:
-
If the power supplied by the combined cycle power plants before the imbalance was over 180 MW (Pcc,0>180MW),ΔP=0
-
If the estimatedΔPwith the regression is negative (ΔP<0),ΔP=0
Moreover, the maximum overproduction powerΔPof the wind power plant was considered as 20% over the installed capacity of the wind power plant,ΔPmax=0.2·Pw.
4.3. Results Apart from the adaptive control approach, other frequency strategies have been simulated and compared for the sixty scenarios under consideration:
- Frequency control only provided by thermal power plants (referred to as without VSWTs).
-
Frequency control provided by thermal power plants and VSWTs. The overproduction is defined as proportional toΔf; change from overproduction to recovery period occurs whenω/ω0<0.9, andpUP=0.05pu (fast power reserve technique). It is triggered whenΔf≥100mHz and the maximumΔp=0.15·pmech(ω)(referred to as previous approach).
- Frequency control provided by thermal power plants and VSWTs using the proposed control approach (referred to as adaptive approach).
As was discussed in Section 4.1, sixty different scenarios are considered to evaluate the new frequency control approach for VSWTs. Results are focused on four different aspects for each scenario: (i) the minimum rotational speedωmin; (ii) the maximum torqueTmax; (iii) the power shed due to the corresponding load shedding programs; (iv) number of cases in which VSWTs do not participate in frequency control with the adaptive proposed approach. BothωminandTmaxare expressed in % with regard to the pre-event values, which is equal to their values when they do not participate in frequency control.
Figure 9 depicts the range values of the rotational speed in % compared to the pre-event value. When VSWTs do not participate in frequency control, itsωvariation is null, as they are providingpMPP(sw). According to these results, and depending on the frequency control strategy, important differences can be identified. With regard to the frequency control referred to as previous approach, and considering that the change from overproduction to recovery period is always withω/ω0<0.9, all scenarios then give the same minimumω, which represents more than a 7% variation. Based on the adaptive approach,ωminvariations range in between 0 (for those cases in which the frequency control is not activated) and 6.62%. In fact, the averageωminvariation with the proposed strategy is 2.15%. As a consequence, the new frequency control strategy technique does not only optimize those imbalances where VSWTs frequency control participation is required but also reduces the averaged variation ofωto more than half of the previous frequency control approaches.
Figure 10 compares the maximum torque during the VWST frequency response to the corresponding pre-event value. These results are in line with the previous rotational speed comparison, see Figure 9. The torque does not vary when VSWTs do not participate in frequency control, as bothωandperemain constant. With the previous approach for VSWT frequency control, the maximum torque variation is always the same. Moreover, this variation is over a 30% increase—in comparison to the pre-event value, which can address relevant mechanical loads on the turbine shaft. In contrast, with the proposed adaptive approach, the maximumTmaxvariation is 26.5% (only 9 out of 60 scenarios), with an averageTmaxof 9.7%. It can be then deduced that the new frequency control approach does not only avoid the activation of the frequency control of VSWTs in most of imbalance scenarios but also that bothωandTmaxranges are reduced significantly compared to previous approaches.
Figure 11 shows the power shed by the load shedding program. As can be seen, it is reduced when wind power plants participate in frequency control, compared to the current case in which only thermal power plants are providing such ancillary service. Comparing the two different frequency control approaches analyzed, small differences are found. The previous approach gets better results in 4 out of 60 scenarios under study, whereas the adaptive approach obtained lower load shedding values in 2 out of 60 scenarios. In the other cases, both frequency controllers obtain the same load shedding.
Finally, 57% of imbalances without any VSWTs frequency response participation have been identified. These results reduce significantly the mechanical and electrical VSWT efforts under imbalances, maintaining similar frequency excursions to the previous control strategies. More specifically, the VSWT frequency participation is not required to provide additional power in 11 out of 30 for the largest power plant loss and 23 out of 30 for the second largest power plant loss. These 34 scenarios where the adaptive frequency control is not triggered can be seen in Figure 9 and Figure 10: imbalance scenarios will null variation ofωminandTmaxfor the proposed control strategy. Therefore,peandωvalues keep as constant during the imbalance and, subsequently, also maintain the torque. In addition, authors have checked that in 94% of the cases in which VSWTs are not participating in frequency control with the adaptive approach, the power shed was initially null, pointing out that their participation was not required within acceptable frequency excursion ranges.
As an additional result, Figure 12, Figure 13 and Figure 14 depict the frequency evolution, load shedding, wind power, and rotational speed for scenarios 9, 16, and 27, respectively, for the loss of the largest power plant. Together with the aforementioned advantages of the new approach, authors also point out that the rotational speed of VSWTs is recovered in a lower time interval than with the previous frequency control approach. Moreover, the transition from overproduction to recovery period is also smoother, avoiding undesirable secondary frequency dips (refer to Figure 12).
5. Conclusions Due to the massive penetration of VSWTs, their contribution to frequency regulation has become a need. As isolated power systems have low synchronous inertia, VSWTs frequency control is even more required. Even though different control strategies for VSWTs have been proposed in the last decade, they usually imply important drawbacks in terms of efficiency, economic profits, and/or equipment wear. As a result, with the aim of reducing the mechanical stress of VSWTs providing frequency response, an adaptive control strategy is proposed in this work. Our approach is based on estimating the minimum overproduction power provided by VSWTs following a linear regression estimation. In this way, such overproduction power depends on some grid parameters (i.e., RoCoF, synchronous inertia, and assigned power of thermal units before the incident). The proposed controller is compared to a conventional fast power reserve strategy. The Gran Canaria isolated power system (Spain) is considered as case study, analyzing sixty representative imbalance scenarios. Results show that similar values for the power shed with the load shedding program are obtained with the two approaches. However, the new adaptive control reduces the VSWTs maximum torque variations and the speed variations (23% and 5% on average, respectively), in comparison to the conventional VSWTs frequency control strategy. This is due to the smoother transition from overproduction to recovery periods, which reduces the electrical and mechanical VSWT efforts. In addition, in 57% of the imbalance scenarios under consideration, VSWTs are not required to participate in frequency response. Thus, both electrical power and rotational speed are kept as constants (subsequently maintaining the torque). As a result, a longer life span is expected for the VSWTs electrical and mechanical components.
Steam | Gas | Combined Cycle | Diesel | ||||
---|---|---|---|---|---|---|---|
Pst,1 | 72.4 MW | Pgas,1 | 32.3 MW | Pcc,1 | 206.1 MW | Pdie,1 | 8.5 MW |
Pst,2 | 72.4 MW | Pgas,2 | 32.3 MW | Pcc,2 | 227.0 MW | Pdie,2 | 8.5 MW |
Pst,3 | 55.6 MW | Pgas,3 | 17.3 MW | Pdie,3 | 8.5 MW | ||
Pst,4 | 55.6 MW | Pgas,4 | 32.3 MW | Pdie,4 | 20.5 MW | ||
Pgas,5 | 32.3 MW | Pdie,5 | 20.5 MW |
Author Contributions
Conceptualization, J.I.S.; Data curation, A.F.-G.; Formal analysis, G.M.-L.; Investigation, A.F.-G.; Methodology, J.I.S.; Resources, A.F.-G. and G.M.-L.; Software, A.F.-G.; Supervision, Á.M.-G. and J.I.S.; Validation, G.M.-L. and J.I.S.; Visualization, Á.M.-G.; Writing-original draft, A.F.-G. and G.M.-L.; Writing-review and editing, A.M.-G. and J.I.S. All authors have read and agreed to the published version of the manuscript.
Funding
This work was partially supported by 'Ministerio de Educación, Cultura y Deporte' of Spain (ref. FPU16/04282) and by 'Ministerio de Economía y Competitividad', under the project "Value of pumped-hydro energy storage in isolated power systems with high wind power penetration" of the National Plan for Scientific and Technical Research and Innovation 2013-2016, grant number ENE2016-77951-R.
Conflicts of Interest
The authors declare no conflict of interest.
Abbreviations
The following abbreviations are used in this manuscript:
β | Pitch angle (grades) |
ω | Rotational speed (p.u.) |
ΔP | Overproduction power of VSWT (MW) |
ΔRR | Total secondary regulation effort |
f | Frequency (Hz) |
p | Active power (p.u.) |
sw | Wind speed (m/s) |
Dnet | Damping factor of loads |
Ku | Participation factor in secondary control |
P | Active power (MW) |
Tm | Inertia constant (s) |
0 | Pre-event value (subscript) |
cc | Combined cycle (subscript) |
dem | Demand (subscript) |
die | Diesel (subscript) |
gas | Gas (subscript) |
max | Maximum value (subscript) |
mech | Mechanical (subscript) |
min | Minimum value (subscript) |
st | Steam (subscript) |
ther | Thermal (subscript) |
w | Wind (subscript) |
UP | Underproduction (subscript) |
AGC | Automatic Generation Control |
II-RES | Inverter Interfaced Renewable Energy Sources |
MPP | Maximum Power Point |
PV | Photovoltaic |
RoCoF | Rate of Change of Frequency |
TSO | Transmission System Operator |
VSWT | Variable Speed Wind Turbine |
You have requested "on-the-fly" machine translation of selected content from our databases. This functionality is provided solely for your convenience and is in no way intended to replace human translation. Show full disclaimer
Neither ProQuest nor its licensors make any representations or warranties with respect to the translations. The translations are automatically generated "AS IS" and "AS AVAILABLE" and are not retained in our systems. PROQUEST AND ITS LICENSORS SPECIFICALLY DISCLAIM ANY AND ALL EXPRESS OR IMPLIED WARRANTIES, INCLUDING WITHOUT LIMITATION, ANY WARRANTIES FOR AVAILABILITY, ACCURACY, TIMELINESS, COMPLETENESS, NON-INFRINGMENT, MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. Your use of the translations is subject to all use restrictions contained in your Electronic Products License Agreement and by using the translation functionality you agree to forgo any and all claims against ProQuest or its licensors for your use of the translation functionality and any output derived there from. Hide full disclaimer
© 2020. This work is licensed under http://creativecommons.org/licenses/by/3.0/ (the “License”). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.
Abstract
The lack of synchronous inertia, associated with the relevant penetration of variable speed wind turbines (VSWTs) into isolated power systems, has increased their vulnerability to strong frequency deviations. In fact, the activation of load shedding schemes is a common practice when an incident occurs, i.e., the outage of a conventional unit. Under this framework, wind power plants should actively contribute to frequency stability and grid reliability. However, the contribution of VSWTs to frequency regulation involves several drawbacks related to their efficiency and equipment wear due to electrical power requirements, rotational speed changes, and subsequently, shaft torque oscillations. As a result, wind energy producers are not usually willing to offer such frequency regulation. In this paper, a new control technique is proposed to optimize the frequency response of wind power plants after a power imbalanced situation. The proposed frequency controller depends on different power system parameters through a linear regression to determine the contribution of wind power plants for each imbalance condition. As a consequence, VSWTs frequency contribution is estimated to minimize their mechanical and electrical efforts, thus reducing their equipment wear. A group of sixty supply-side and imbalance scenarios are simulated and analyzed. Results of the case study are compared to previous proposals. The proposed adaptive control reduces the maximum torque and rotational speed variations while at the same time maintaining similar values of the load shedding program. Extensive results and discussion are included in the paper.
You have requested "on-the-fly" machine translation of selected content from our databases. This functionality is provided solely for your convenience and is in no way intended to replace human translation. Show full disclaimer
Neither ProQuest nor its licensors make any representations or warranties with respect to the translations. The translations are automatically generated "AS IS" and "AS AVAILABLE" and are not retained in our systems. PROQUEST AND ITS LICENSORS SPECIFICALLY DISCLAIM ANY AND ALL EXPRESS OR IMPLIED WARRANTIES, INCLUDING WITHOUT LIMITATION, ANY WARRANTIES FOR AVAILABILITY, ACCURACY, TIMELINESS, COMPLETENESS, NON-INFRINGMENT, MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. Your use of the translations is subject to all use restrictions contained in your Electronic Products License Agreement and by using the translation functionality you agree to forgo any and all claims against ProQuest or its licensors for your use of the translation functionality and any output derived there from. Hide full disclaimer